Floodplain LiDAR survey, Central Mississippi

Completed a 4,100-acre LiDAR topographic survey and generated terrain, contour, and cut/fill deliverables in 4 flight days, reducing a survey timeline that was originally estimated at 7 weeks.
Image

Powerline corridor LiDAR survey, Northern California

Completed a 4,100-acre LiDAR topographic survey and generated terrain, contour, and cut/fill deliverables in 4 flight days, reducing a survey timeline that was originally estimated at 7 weeks.
Image

Pipeline corridor LiDAR mapping, South Louisiana

Mapped a 48-mile pipeline corridor with sub-10cm vertical accuracy, delivering a georeferenced point cloud and CAD-ready terrain model within one week of flight.
Image

Large-scalesite survey Technology

Delivered a complete 3,200-acre topographic survey and cut/fill model in 3 flight days — replacing a 6-week ground survey schedule.